Home | Survey | Payment| Talks & Presentations | Job Opportunities
Journals   A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Construction Technology
1002-8498
2015 Issue 17
Detail Design and Analysis of Ellipsoid Steel Corridor of Wuhan International Expo Center
Lu Tong;Hu Zongyou;Ma Caiwang;Ye Chuang;Wuhan Construction Engineering Co.;Ltd.;
..............page:1-4+17
Simulation Analysis of Ellipsoid Steel Corridor of Wuhan International Expo Center
Lu Tong;Wuhan Construction Engineering Co.;Ltd.;
..............page:5-8
Making Technology of Porous Coaxial and Special-shaped Component with Great Bearing Capacity and Extra-thick Plate for Wuhan International Expo Center
Hu Zongyou;Lu Tong;Ma Caiwang;Peng Jing;Wuhan Construction Engineering Co.;Ltd.;
..............page:9-12
Similar Factory Assembly of Ellipsoid Steel Corridor on the Top of the Podium for Wuhan International Expo Center
Lu Tong;Ma Caiwang;Hu Zongyou;Xiong Wenhui;Wuhan Construction Engineering Co.;Ltd.;
..............page:13-17
Low-position Assembly of Ellipsoid Shell of Wuhan International Expo Center
Lu Tong;Wuhan Construction Engineering Co.;Ltd.;
..............page:18-21+32
Laboratory Test Study on Light Weight Aggregate in Bridge Deck Pavement
Wang Danjing;Art Design Department;Wuxi Institute of Commerce;
..............page:22-25
Pre-stretching and Pre-pushing Construction Method of Bridge Tower Based on Response Surface Method
Zhou Junlong;Gao Jie;Wu Chunlei;China Construction Sixth Engineering Bureau Co.;Ltd.;
..............page:26-28
Directly Hoisting Method Suitable for Large Size Arch Rib Segments with Complex Spatial Position
Zhang Junjuan;Li Xu;School of Transportation and Surveying Engineering;Yangling Vocational and Technical College;Design Branch;China Railway Major Bridge Engineering Co.;Ltd.;
..............page:29-32
Study on the Bearing Capacity Estimation of Deck Type Concrete Box Arch Bridge Based on Load Test
Wang Haipeng;Engineering Consulting & Design Institute;Northeast Forestry University;
..............page:33-35+73
Fuzzy Comparison of Construction Schemes for Elevated Section over Ji’nan-Guangzhou Highway Bridge
Wang Guofu;Hu Yongli;Lu Linhai;Ji’nan Rail Transit Group Co.;Ltd.;
..............page:36-39
Application of Fabricated Composite Steel Box Girder in Bridge Engineering
Su Lichao;Xingtai Road & Bridge Construction Co.;Ltd.;
..............page:40-41+78
Study on Repair and Replacement of Tension and Compression Steel Bearing for Steel Truss Girder
Liu Hongyu;Li Hongsheng;Guang Ming;No.1 Engineering Co.;Ltd.of FHEC of CCCC;
..............page:42-46
Analysis of Dynamic Response of Rigid Pavement in Process of Breaking with Pickaxe Machine
Su Erhao;Shanghai East China Civil Aviation Airport Construction Supervision Co.;Ltd.;
..............page:47-51
Study on Cracking Control Technology of Post-cast Strip Concrete in Base Plate for CRTSⅡ Type Slab Ballastless Track
Xin Xuezhong;Ding Rensheng;Zheng Xinguo;Zhu Changhua;Liu Jing;Shanghai-Kunming Railway Passenger Dedicated Line Zhejiang Co.;Ltd.;Institute of Railway Construction;China Academy of Railway Sciences;
..............page:52-55
Experimental Study on Soil Squeezing Effect of Pipe Pile in Soft Soil Subgrade
Xia Jinhua;Ji Guanghui;Li Zhongliang;Department of Civil Engineering;He’nan Radio & Television University;He’nan Expressway Development Co.;Ltd.;
..............page:56-59
Design and Experimental Analysis of Reinforced Soil Slope Protection of Reinforcement Subgrade in Tibet Frozen Soil Area
Zhao Licai;School of Civil Engineering;Tianjin University;
..............page:60-63+83
Study on the Lofting Design of Surface Formwork
Qian Jun;Guo Zhengxing;Liu Rubing;School of Architecture and Civil Engineering;Taizhou Polytechnic College;School of Civil Engineering;Southeast University;
..............page:64-66+90
Study on the Method for Determining Removal Early Time of Aluminum Alloy Formwork
Luo Qiling;Wang Weilun;Liu Honghai;Hu Dawei;Guangdong Provincial Key Laboratory of Durability for Marine Civil Engineering/Shenzhen Durability Center for Civil Engineering;Shenzhen University;The First Construction Engineering Limited Company of China Construction Third Engineering Bureau Co.;Ltd.;
..............page:67-69
Application of the New Tool-typed Scaffold in Super Tall Building Construction
Huang Shiming;Chen Wuping;Zhang Wenjun;Shu An;The Second Construction Co.;Ltd.of China Construction Third Engineering Bureau;
..............page:70-73
Research and Application of Temporary Support Frame for Rotating Fastener
Li Guoyao;Li Qinshan;Wang Yuan;Hou Zhiyong;Pingmei Shenma Construction Engineering Group Co.;Ltd.;
..............page:74-78
Current Situation and Prospect of 3D Printing Technology in Building Field
Tian Wei;Xiao Xuwen;Miao Dongmei;China Construction Eighth Engineering Division Co.;Ltd.;College of Civil Engineering and Architecture;Zhejiang University;China State Construction Engineering Co.;Ltd.;
..............page:79-83
Application of 3D Printing Technology for Multistory Buildings
Bai Jie;Ge Jie;Miao Dongmei;Ma Rongquan;Engineering Institute of China Construction Eighth Engineering Division Co.;Ltd.;
..............page:84-86
Experimental Study on Reinforced Concrete Shear Wall Reinforced by Different Fiber Sheet
Feng Huimei;Zhao Jun;Bai Shuxing;School of Engineering Technology;Zhongzhou University;School of Civil Engineering;Zhengzhou University;He’nan Huahui Nonferrous Engineering Institute Co.;Ltd.;
..............page:87-90
Tension Construction Technology of Glass Curtain Wall Supporting Cable Nets for Hefei Xinqiao International Airport Terminal
Shu Chang;Ding Chenting;Wang Yuanqing;Shi Yongjiu;Zheng Yan;Key Laboratory of Civil Engineering Safety and Durability of China Education Ministry;Tsinghua University;China Wuzhou Engineering Group Co.;Ltd.;School of Civil Engineering;Dalian University of Technology;
..............page:91-94
Construction Technology of Energy-saving Glass Curtain Wall with Introversion and Outward Inclination Unit Body
Li Qingda;Zeng Lingrui;Li Weiming;Li Rong;China Construction Third Engineering Bureau Co.;Ltd.;
..............page:95-97+119
Application of FAVCO 3-beam Interior Climbing Tower Crane in Russian Federal Building Project
Huang Yong;Wang Jiang;Bai Tai;Li Zhiwei;China Construction First Group Construction & Development Co.;Ltd.;
..............page:98-100
Hoisting Technology of a New Indoor Ultra-high and Overweight Non-standard Bridge Crane
Sui Jieming;Tianjin Branch;China Construction Eighth Engineering Division Co.;Ltd.;
..............page:101-103
Study on Meso-mechanical Simulation of Groundwater Inrush Pathway Mechanism Between High-pressured Karst Cave and Tunnel
Sun Feng;Teng Keyan;Zhao Lei;Hu Mengqian;Wu Han;Lin Hui;Nuclear and Radiation Safety Center;Ministry of Environment Protection;
..............page:104-108
Receiving Technology of Steel Sleeve for Shield Machine Under the Conditions of Local Block Ground
He Weiguo;Track Traffic Engineering Co.;Ltd.of China Railway No.1 Group;
..............page:109-112
Research and Application of Canal Forming Technology of Diaphragm Wall in Fault and Karst Zone
Li Lingyi;Beijing Municipal Road & Bridge Group Co.;Ltd.;
..............page:113-115
Application of Rear Supporting Technology in Existing Underground Structure Reconstruction
Chen Xin’an;Huang Liang;Wang Liangbo;Liu Depeng;Xu Zongyan;The Second Construction Co.;Ltd.of China Construction Third Engineering Bureau;
..............page:116-119
Reinforcement Technology of Large-scale Steel Sheet Pile Cofferdam in Soft Foundation on the Sea
Xu Hui;Liang Zhiguo;Shanghai Jianfeng Vocational College;
..............page:120-123
Design and Application of Portable and Movable Welded Grillage Slabs with Adjustable Span
Xu Shijie;Jia Haitao;Xu Lianmin;Feng Feng;Meng Xiangchong;Ran Xuyong;Qingdao Greenton Architectural Design Co.;Ltd.;China Construction Steel Structure Co.;Ltd.;
..............page:124-126