Railway Construction Technology
1009-4539
2013 Issue 5
Construction Technology for Tunneling Through Underground Pressure Pipeline
Wang Shuanglong;Wu Hao
..............
page:54-57
Deep Water Bridge Steel Cofferdam Assembly Platform Design and Construction Technology
Bi Yongqing
..............
page:68-71
Construction Technology for New Tunneling Underneath Existing Highway Tunnel
Cao Hailin
..............
page:58-61
Construction Technology for Shield Tunnel Goes Through Housing Group Piles Foundation
Zhou Xiaoan
..............
page:29-32
Construction Technology of Major Diameter Pile Foundation in Deep Water in Carst Areas
Song Xiaorong
..............
page:1-3,12
The Technique of Curtain Wall Exterior Insulation with Superfine Inorganic Fiber Covering Waterproof Membrane Constriction
Jiang Rui
..............
page:103-107
Research on Railway Communication Optical Cable Line Movement and Cutting-over Construction Technology
He Leigang
..............
page:100-102
The Key Construction Technology for the Main Tower Cap of Newly-built Haihe River Bridge
Song Xiaorong
..............
page:8-12
Three Dimensional Shaped Charge Blasting Technique for Daya Bay Reactor Neutrino Experiment Station
Wang Suiming
..............
page:42-44
Technology of the Excavation and Blasting Control of Underground Caverns Close to Nuclear Reactors
Shi Weinan
..............
page:38-41,50
Tunnel Shield Traversing & Launching Technology for Long Distance in Large Section Dove-Tail Tunnel
Du Wanqiang
..............
page:25-28,32
Application of Built-in Anchor Tensioner in Prestress Tensioning System
Zhang Honghua
..............
page:51-53
Ⅳ-class Rock Section of the Water-rich Karst Tunnel Gushing and Grouting Reinforcement Thickness Analysis
Zhou Yuantao
..............
page:65-67
Construction Technology for Oriented Horizontal Churning Pile in Weak and Water-rich Stratum
Zhi Jianguo
..............
page:21-24
Construction Quality Control Technology of Cement Emulsified Asphalt Mortar of Slab Ballastless Track
Wang Lei
..............
page:86-89,93
Construction Technology of Yingxiu Extra-long Tunnel Open Tunnel
He Yang
..............
page:45-47
Construction Technology on Thermal Correction of the CWR Weld
Zhang Huaijun
..............
page:76-81
The Application of TKC-Ⅰ Concrete Curing Agent in High-speed Railway in Sandy and Dry Areas
Chen Jiangxia
..............
page:98-99,111
Construction Technology for Pile Foundation of the 2nd Hanjiang River Bridge No.45 Pier in Deep Water
Li Shengrong
..............
page:4-7
Improvements on Steel Banding Technology of High-speed Rail Turnouts Plate
Li Xuelian
..............
page:82-85
Design and Application of Soft Ground Bracket Treatment
Zhang Yongsheng
..............
page:48-50
Subsidence Monitoring Technology of Temporary Railway Bridge Above Deep Pit
LI Yunming
..............
page:108-111
Impact of Different Proportions of Cementitious Material on Flow Value
Guo Hong
..............
page:94-97
Numerical Simulation Analysis of Deformation Law of Tunnel Surrounding Rock and Reinforced Structure
Hou Debiao
..............
page:62-64,81
Turnout Slab Track Self-compacting Concrete Mixture Ratio Selection
Zhang Weipeng;Jiang Pengkun
..............
page:90-93
Construction Technology of Modular System Beam Base
Cao Huiqin
..............
page:72-75
xin xi dong tai
..............
page:后插1
Construction Techniques of Steel Pipe Arch Cable Bridge Hoisting in Hanjiang River No.2 Bridge in Yunxian County
Ru Lijun
..............
page:13-16
The Design and Construction of Long-span Cast-in-situ Box Beam with Limited Bracket Within the River Bed
Wang Zhiqiang
..............
page:17-20
Analysis and Countermeasure for Avoidance of Elevation Limit during the Shield Machine Drilling through Ventilation Well
Li Xiaosheng
..............
page:33-37