Railway Construction Technology
1009-4539
2015 Issue 6
Growth Road of China’s Large Tonnage Hoisting Beam Machine from Its Beginning to Sustained Leading Position in the World
Huang Yaoyi;,Yu Chunhong;
..............
page:1-17
Safety Management Control Points for Construction of Gas-bearing Tunnels
Zhang Zhi;
..............
page:18-22
Design for High-speed Railway Bridge and Culvert Frame Structure Based on German Code
Feng Yin;
..............
page:23-26,72
Crack Prevention Construction Technology of Large Rib Cantilever Beam Cast-in-place on Soft Soil Foundation
Qian Jianzhong;
..............
page:27-31
Construction Design of Cable-stayed Bridge with the Rotation Weight of 22 400 t
Jiang Baoli;
..............
page:32-35,56
Separated Trolley Used for Arch and Wall Applying to Secondary Lining Construction of Large Section Tunnel in Subway Project
Huang Guangkai;
..............
page:36-39,62
Technology for Pulling and Jointing Pipes in Dock of Haihe River Tunnel Under the Central Avenue
Dai Jingjun;
..............
page:40-43
Construction Technology of Shield Construction Close to Underpassing Large Section Highway Tunnel
Li Tiejun;
..............
page:44-47
Application of Pile Board Structure in Gaotian Tunnel Base Karst Cave Construction
Wei Haihe;
..............
page:48-52
Analysis of Single Track Railway Tunnel Lining Cracking Reasons and Its Corresponding Treatment Measures
Wang Kuidong;
..............
page:53-56
Scheme for Fuzhou to Xiamen Passenger Dedicated Line Introducing into the Passenger System of Xiamen Hub
Fang Jixiang;
..............
page:57-62
Study on Strength Control Design Method of Heavy-haul Railway Subgrade Bedding Structure
Liu Jinglei;,Song Xuguo;,Ye Qingzhi;,Luo Qiang;,Dong Jie;
..............
page:63-68
Application of Topographic Maps from Stereo Images of High Resolution Remote Sensing Satellites in Oversea Railway Survey and Design
Jiang Junjie;
..............
page:69-72
Real-time Prediction Method in Evaluating Rolling Effect of Mudstone Packed Subgrade
Xu Jun;
..............
page:73-75,79
Setting of Railway Lines Protective Fence and the Problems and Its Countermeasures During Construction
Huang Yimin;
..............
page:76-79
Simulation Calculation on the Returning Current of Traction Power Supply System of Passenger Dedicated Line and Analysis of the Sectional Area of the Grounding Cable
Huang Rong;
..............
page:80-82,97
Key Points of Cone-Type Terminal Anchor Clamp Installation Technology and Quality Control for OCS in Strong Wind Area
Xu Kaiwen;
..............
page:83-86
Load Flow Analysis of External Power Supply Scheme for Qingdao’s Blue Silicon Valley Intercity Rail Project
Xie Hui;
..............
page:87-90,104
Construction Technology of the Existing Communication Transmission Equipment Expansion
Guo Zhengping;
..............
page:91-93
Real-time Monitoring and Analysis of Tension for Large-span Pre-stressed Concrete Frame Beam
Gao Hongyu;
..............
page:94-97
Cause Analysis and Quality Control of High-rise Residential Entrance Gatehouse Settlement
Gao Zhen;
..............
page:98-99,108
Cement-emulsified Asphalt (CA)Mortar Construction Techniques on CRTSⅠSlab Ballastless Track in Cold Regions
Liao Taichang;,Shen Ya’ni;
..............
page:100-104
Research on High Performance Concrete Preparation Methods
Zhou Zhitao;
..............
page:105-108
Application on Balance Valve in Hydraulic System of Erection and Laying Equipment and Its Malfunction Analysis
Shu Jianping;
..............
page:109-112
Analysis on the Current Situation of Construction Enterprise by Financial Statement
Liu Dongli;
..............
page:113-116,120
Lassen Steel Sheet Pile’s Application on Deep Foundation Pit Supporting Engineering in Estuary’s Flap Gate
Sun Lianbo;
..............
page:117-120
Technological Process Design on a Newly-built Water Recycling Plant and Its Optimization
Zhao Wenli;
..............
page:121-123