Home
|
Survey
|
Payment
|
Talks & Presentations
|
Job Opportunities
Journals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Railway Construction Technology
1009-4539
2016 Issue 6
Construction Technology on Concrete Cable-stayed and Buckle-hanging Combined with the Ring-section of Large-span Arch Bridge’s Arch Ring
Yu Changbin;
..............
page:1-4
Multi-point Simultaneous Continuous Pushing Construction of Large-span Steel Truss Girder
Zhou Hongshun;
..............
page:5-7,18
Construction Technology of the Small Angle Pushing Frame Construction Underpassing the Heavy-haul Railway
Li Min;
..............
page:8-10,22
Arch Feet Construction Technology for Space Curved Surface of Four Lines Passenger Dedicated Line with the Three Arch Rib Tied-arch Continuous Beam Bridge
Gao Peng;
..............
page:11-14,59
Optimization Research on Positioning Calculation of Arch Rib of 112 m Basket Handle Arch
Zhang Panhua;,Liu Side;,Jiang Hongshan;
..............
page:15-18
Construction Technology Research of Asymmetric Hanging Basket on Continuous Beam No.0 Block
Yin Kesi;
..............
page:19-22
Construction Technology of Large Section Subsea Tunnel Running Across the Water-rich Sand Layer Under the Complex Geology
Huang Mingqi;
..............
page:23-26,31
Application of Pilot Tunnel Expanding Excavation in TBM Construction in Strong Rock Burst Section
Jing Qi;
..............
page:27-31
Construction Technology on Inverted Arch Pile-plank Structure of Swelling Surrounding Rock Tunnel
Guo Fengying;
..............
page:32-35,55
Numerical Simulation Analysis of WSS Grouting Reinforcement Technology While Tunnel Passing Through the Pile Group and Its Application
Yue Taotao;
..............
page:36-39,47
Study on Shield Tunneling Mode in Upper-soft Lower-hard Layer
Guo Qingbiao;
..............
page:40-42
Fast Uncovering Coal Scheme of New Liangfengya Railway Tunnel with Gas Outburst
Cao Chuanwen;
..............
page:43-47
Safety Technology of Shallow-buried Mined Excavation Replacing the Open Excavation Tunnel Underpassing the Provincial Highway
Feng Wenyu;
..............
page:48-51,72
ISP Geological Prediction System Applied in the TBM Construction of the Hanjiang to Weihe Project
Lv Erchao;
..............
page:52-55
Application of Long Feet-lock in the Construction of Large Deformation Soft Rock Tunnel
Fan Chunyu;
..............
page:56-59
Monitoring and Controlling of Shallow-buried Bias Tunnel Underpassing Highway
Dai Peiyi;,Bai Minglu;
..............
page:60-63,68
Simulation Optimization and Operation Management for High Intensity Transportation System of Large Underground Tunnel Group
Xu Tianzhen;
..............
page:64-68
Technology of the Steel Pipe Column in the Station Constructed by Cut and Cover Reverse Method Under Complex Condition
Li Bin;
..............
page:69-72
Optimization Design on Engineering Technical Measures for Lanzhou-Xinjiang High-speed Railway
Wang Xiaoyou;
..............
page:73-75,80
Foundation Treatment Study of Desert Embankment for North-south Railway in Saudi Arabia
Wan Lianyu;
..............
page:76-80
Suspension Technology Research on Leakage Cable Coverage of Yellow River Bridge on High-speed Railway
Liu Kaichen;
..............
page:81-83,101
Test and Analysis on Vibration Detection of TBM Equipment in Urban Rail Transit Engineering
Liao Jianwei;
..............
page:84-86,106
Supporting Shoe Oil-cylinder Replacing Technology of Large Diameter Main Girder Type TBM Inside Tunnel
Bai Yunfeng;
..............
page:87-90,120
Technology of 900 t Combined Machine for Transport and Erecting at Zero-distance Erecting from Tunnel
Zhang Xuechao;
..............
page:91-94
A Comparative Research on Stability of Expansive Soil Cutting Under Different Height of Slope by ANSYS
Ma Changtao;
..............
page:95-97
Landslide Stability Evaluation and Treatment Scheme of a Highway
Li Lihui;
..............
page:98-101
Study on Calculation Method of Vertical Bearing Capacity of Long Core Strength Mixing Pile Based on Failure Mode
Cheng Bohua;
..............
page:102-106
Research on the Construction of Super Large Diameter Manual Hole Digging Pile by Multi Heading Method and Its Mechanical Property
Lv Keyan;,Zhang Jiantao;,Zhang Xuechen;,Yan Haiqiang;
..............
page:107-110,123
Study on the Cold Compensation System Based on Outdoor Air Supply System for Ground Heat Exchanger
Li Qian;
..............
page:111-115
Influence of Air Content on the Performance of a Railway T-shaped Beam Concrete with Post-tensioning Method
Zhou Qingsong;
..............
page:116-120
Technical Scheme Optimization Innovation and Implementation of Sleeper Steam Curing Workshop
Xie Jingchen;,Sun Lichang;,Gao Fei;
..............
page:121-123
Construction Technology of Expansive Soil Roadbed Catenary Foundation by Rotary Digging Drill in High-speed Railway
Ma Yingchun;
..............
page:124-127